VMware to Azure, without stopping the airline
A sequenced migration of an interdependent VMware estate supporting round-the-clock operations for a South East Asian airline.
Aviation
Client
Migration
Practice
January 2024
Published
01 — The challenge
Where it started.
The estate was a set of interdependent applications on VMware, supporting operations that do not stop. The hard part was never the individual move; it was what breaks when systems that talk to each other sit on different sides of the migration for a period.
Downtime had to be minimal, performance had to match the on-premise baseline, and compatibility between applications had to hold throughout.