Home / Migration / VMware to Azure, without stopping the airline

Case study · Aviation · On-premise to Azure · January 2024

VMware to Azure, without stopping the airline

A sequenced migration of an interdependent VMware estate supporting round-the-clock operations for a South East Asian airline.

Aviation Client
Migration Practice
January 2024 Published

01 — The challenge

Where it started.

The estate was a set of interdependent applications on VMware, supporting operations that do not stop. The hard part was never the individual move; it was what breaks when systems that talk to each other sit on different sides of the migration for a period.

Downtime had to be minimal, performance had to match the on-premise baseline, and compatibility between applications had to hold throughout.

The rest of this study

What we built, what it produced, and the stack behind it.

We share the whole write-up — we would just like to know who is reading. One form opens every case study on the site for the next 30 days.

The rest of this study

Tell us who you are.

What we built, what it produced, and the stack behind it.
We share the whole write-up — we would just like to know who is reading. No newsletter unless you ask for one.

Happy to sign your NDA before a call.

If this is your problem too

Start with a fixed-price pilot.

Two weeks on a real piece of your backlog, priced before we begin. You keep the output whether or not you continue.

Related work